Drazice OKC 250 NTR/HP Bedienings- en installatiehandleiding - Pagina 14

Blader online of download pdf Bedienings- en installatiehandleiding voor {categorie_naam} Drazice OKC 250 NTR/HP. Drazice OKC 250 NTR/HP 16 pagina's. Indirect water tank
Ook voor Drazice OKC 250 NTR/HP: Bedienings- en installatiehandleiding (16 pagina's)

Drazice OKC 250 NTR/HP Bedienings- en installatiehandleiding

2.4 CONNECTION OF TANK TO HOT WATER DISTRIBUTION SYSTEM

The tank is placed on the floor next to the heating source or in its proximity. The heating circuit shall be
connected to marked tank exchanger inputs and outputs, and bleeder valve installed at the highest point.
It is necessary to install a filter into the circuit in order to protect pumps, three-way valve, backflow flaps
and the exchanger from sedimentation. It is recommended to flush the heating circuit before the assembly.
All wiring connections must be properly insulated from heat. If the system works with priority heating of HUW
using a three-way valve, always follow the installation instructions of the three-way valve's manufacturer.
Example of group connection of tanks by Tichellman method for equal HSW withdrawal of from all tanks
ACCEPTABLE
SAFETY VALVE
OPERATING
START-UP
OVER-
PRESSURE
PRESSURE OF
[MPa]
WATER TANK
[MPa]
0.6
0.7
1
Table 3
Figure 6
OV - Heating water
SV - Cold water
C - Circulation
MAXIMUM
PRESSURE IN
COLD WATER
PIPES [MPa]
0.6
up to 0.48
0.7
up to 0.56
up to 0.8
1
TUV - Hot sanitary water
1 - Back pressure valve
2 - Pump
- 14 -