Drazice TO 10.1 UP/IN Bedienings- en installatiehandleiding - Pagina 12
Blader online of download pdf Bedienings- en installatiehandleiding voor {categorie_naam} Drazice TO 10.1 UP/IN. Drazice TO 10.1 UP/IN 14 pagina's.
15 FRONT PANEL
There is a symbol for the signal light of the heater operation.
1
The front panel is equipped with a protective foil which must be removed for proper readability
of the panel.
Figure 2
NAME
Signal light
Table 4
FUNCTION DESCRIPTION
Indication of active heating
- 12 -