Carmanah R829-E Snelstarthandleiding - Pagina 10
Blader online of download pdf Snelstarthandleiding voor {categorie_naam} Carmanah R829-E. Carmanah R829-E 20 pagina's. Traffic beacon
Ook voor Carmanah R829-E: Handleiding vervanging energiebeheersysteem (12 pagina's), Installatiehandleiding (20 pagina's)
Integrated Solar Engine with Signal Head – Square Wood Post
4.5
1. Install mount onto post using suitable fasteners (not supplied).
2. Align serrated lock ring so that tabs fit into slots in bottom of solar engine.
3. Obtain signal housing with reinforcement bracket(s). Install solar engine through top signal housing hole
and into hex nut.
4. Install nipple through load spreader plate (12" signal housings only), bottom signal housing hole, serrated
lock ring, mount hole, and hex nut as shown.
5. Adjust direction of signal if required, and orient solar engine to face South (for Northern Hemisphere
locations).
6. Tighten nipple and top hex nut.
.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
E/F SERIES QUICK START GUIDE
|
carmanah.com
10