Carmanah R829-E Handleiding vervanging energiebeheersysteem - Pagina 11
Blader online of download pdf Handleiding vervanging energiebeheersysteem voor {categorie_naam} Carmanah R829-E. Carmanah R829-E 12 pagina's. Traffic beacon
Ook voor Carmanah R829-E: Snelstarthandleiding (20 pagina's), Installatiehandleiding (20 pagina's)
5. Replace any cable ties that were removed to ensure wires have proper strain relief.
6. Secure the EMS enclosure back into the solar engine or cabinet with the four screws/washers removed
from
Section
3.1.
7. For solar-powered systems, reinstall batteries as required and reconnect all fuses removed from
3.1. For AC-powered systems reinstall any fuses that were removed and turn on the breaker.
The EMS should now power up and is ready for operation. Normally, the EMS is preconfigured by
8.
Carmanah for your specific installation, but the settings can be changed at any time. For crosswalk
applications you may need to adjust the crossing duration and radio channel to match the current
configuration for your application. Please refer to the specific product manual at
for more information or contact Carmanah for assistance.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
ENERGY MANAGEMENT SYSTEM
REPLACEMENT GUIDE
support.carmanah.com
|
carmanah.com
Section
11