Carmanah R829-G Handmatig - Pagina 10

Blader online of download pdf Handmatig voor {categorie_naam} Carmanah R829-G. Carmanah R829-G 11 pagina's. Cabinet-based systems
Ook voor Carmanah R829-G: Snelstarthandleiding (16 pagina's), Handleiding vervanging energiebeheersysteem (12 pagina's), Handboek voor het vervangen van kastdeuren (10 pagina's), Handmatig (9 pagina's), Handmatig (10 pagina's), Installatiehandleiding (14 pagina's), Handmatig (10 pagina's), Handmatig (10 pagina's)

Carmanah R829-G Handmatig
6. Test system and ensure it is operating as prior to the retrofit.
a. Ensure the solar voltage (solr) is between 15-20V.
b. Run the BIST (built-in self-test) and verify there are no errors, in particular the charging error
(4000).
c. Let the system charge for a few minutes and confirm battery voltage rises under the battery (batt)
status. For 24/7 beacon systems you may need to temporarily change the input (inpt) to NO
(normally open) so the system isn't under a constant power draw
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
AC TO SOLAR RETROFIT GUIDE
|
carmanah.com
10