Anderson ANM75 Bedieningshandleiding - Pagina 11
Blader online of download pdf Bedieningshandleiding voor {categorie_naam} Anderson ANM75. Anderson ANM75 18 pagina's.
to overshoot.
10.9 Stop Procedure
Do not turn the combustion air blower off until the chamber temperature is below
120°C. This will prevent hot gases from back flowing into the burner and blower
causing damage to the burner.
1. Stop the burner through the burner control system.
2. Run the combustion air blower until the chamber temperature drops below 80°C.
3. Shut off the combustion air blower.
4. Close all manual gas valves to the burner
11. Burner Maintenance
Preventive maintenance is the key to a reliable, safe and efficient combustion system. The
core of any preventive maintenance system is a list of periodic tasks. These are guidelines
only. The customer should make the final determination on maintenance intervals and
tasks to be performed while considering the working environment.
System regular safety audit must be taken out, including gas leakage check no longer than
every half a year. If necessary, the frequency of audit should be increased. Leak detection,
control functions of the equipment must be included in the scope of audit. Only Anderson
technicians or those who are been trained and qualified by Anderson, as well as other
relevant professionals, can maintain the burners. All valves, especially ball valves, must be
slowly open or close when switching in order to prevent pressure shock in pipe.
11.1 Half a year checklist
– Inspect the flame sensing devices for good condition and cleanliness.
– Check for proper air and gas pressures.
– Test all the system alarms for proper response signals.
– Check and clean igniter electrodes.
– Check valve motors and control valves for free, smooth action and adjustment.
– Check for the proper operation of ventilating equipment.
– Test the interlock sequence on all safety equipment. Manually force each interlock to
intentionally fail while at the same time noting if related equipment closes or stops as
specified by the manufacturer. Test the flame safeguard by manually shutting off the
gas to the burner.
– Test the manual gas shut off cocks for proper operation.
– Inspect and clean the combustion air blower rotor. Clean and/or replace the
combustion air blower filter if applicable.
11.2 Yearly checklist
– Leak test the safety shut–off valves and pipe for tightness of closure to make sure no
leakage.
– Test the pressure switch settings by checking the switch movements against pressure
settings and comparing these with the actual impulse pressure.
Anderson Thermal Soluions(Suzhou)Co. ,Ltd.
Anderson Thermal Solutions – ANM75 Burner Operation Manual
9