Dreamline ENIGMA-Z SHDR-62487610 Series Handleiding voor installatie-instructies - Pagina 17
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Dreamline ENIGMA-Z SHDR-62487610 Series. Dreamline ENIGMA-Z SHDR-62487610 Series 20 pagina's. Shower door & tub door
16
. Press the Anti-water strip (#14) on the vertical edges of the
Stationary glass (#02) and the Glass door (#05). Also press the
Bumper seal strip (#13) on the vertical edge of the Glass door
(#05).
Mount the Handle (#06) to the Door Glass (#05).
Adjust both Door stoppers (#01) to ensure that they are positioned
upright and the Glass door (#05) is in its maximum opening and
closing range. Apply thread lock to the set screws and tighten the
set screws to fasten them in place.
Adjust the Roller guards (Fig 18) on both Roller assemblies (#04)
to within 1/16" of the Upper guide rail (#03) to ensure that the
Glass door (#05) is secure.
NOTE: The Door stoppers (#01) must be positioned correctly to
prevent the handle from contacting the Stationary glass (#02)
and to stop the Door glass (#05) in a position that allows the
bumper strip to create a seal with the wall, but does not allow
the door glass to bang into the wall.
Observe the correct position of these stoppers and re-position if
necessary.
17.
Door Stopper Installation:
1. Loosen the set screw
2. Slide the Door Stopper (#01) onto the Upper Guide Rail (#03)
3. Align with stopper hole (stationary panel side only)
4. Apply Thread lock adhesive (#20) to the set screw threads
5. Tighten screw into the stopper hole (stationary panel side only)
6. Correctly position and tighten screw into the stopper (door side)
Stopper
ENIGMA-Z manual Ver 1 Rev 4 10/2016
See Fig. 20 for details
1
Panel side
See Fig. 21 for details
2
Stopper
hole
(Right hand door installation shown as example)
Fig. 21
1
Door
Door
Panel
3
5
Fig. 20
1/16"
1/16"
*Roller guards must be tight and
the distance beneath the guide rail
should be approximately 1/16" max.
3
Door side
Stopper (#01)
2
4
6*
4
17