Dreamline SHCM-1007-00 Installatiehandleiding - Pagina 5
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dreamline SHCM-1007-00. Dreamline SHCM-1007-00 7 pagina's. Shower column
III.
Preparation
1. After opening the box, read this introduction carefully, check all the packed parts are complete by
cross checking of all the components. Examine for shipping damage. If the unit has been damaged or
has a finishing defect, please contact your local distributor within 2 business days. Please note that
Bath Authority™ / DreamLine™ will not replace any damaged product or parts free of
charge, ONCE the product has been installed. Your distributor's responsibility for damage in
transit is limited after the shower package has been transferred to the transportation company, so you
may have to contact the transportation company directly to report damage. Contact your distributor
or DreamLine if you have any questions.
2. You should consult your local building codes on questions on installation compliance standards.
Install all of the required plumbing. Your plumber will need to supply with two ½" male threaded
pipes for hot and cold water outlets. Use a competent and licensed (if required by local code)
plumber for all plumbing installation.
3. Please, note that there are some adjustments and drilling might be necessary during the installation
process.
IV.
Column Installation
Refer to the technical diagram to choose the proper location for your shower column. You can adjust
the column's vertical position based on the person's height. Measurements given in the technical diagram
are based on the average human height 68" – 70").
1. Choose the proper location for your column and mark the drill holes. Please, refer to the diagram for the
pre-drilled holes instruction.
2. Insert Wall anchors (2) inside the holes.
3. Tighten the metal brackets (1) with screws (3) to the wall.
4. Place rubber washer into Top shower head (4).
5. Connect the Top shower head (4) to the shower column body.
6. Connect the flexible hot and cold water supply lines to hot and cold water outlets (supplied by your
plumber) accordingly. Hang Column on to the Metal Brackets (1).
7. Connect the hand shower (5) to the hose (6) fastening nut. Note: Before fastening the nut be sure not to
forget to use the rubber gasket for a tight seal.
8. Locate the desired position of the hand shower wall mounting bracket and mark the drill holes.
9. Drill the holes and insert wall anchors inside the holes.
10. Secure the hand shower wall mounting bracket to the wall with screws.
Our product may have changes without prior notice
For the latest manual version, please, check online
www.bathauthority.com
5
Rev. 1.1