DREAMS JAMESON BED KING Montagehandleiding - Pagina 6
Blader online of download pdf Montagehandleiding voor {categorie_naam} DREAMS JAMESON BED KING. DREAMS JAMESON BED KING 8 pagina's.
IMPORTANT
Once the feet have been
assembled and attached,
they should be adjusted to
ensure they do not touch
the floor, (10mm above the
floor) to allow for movement
once the mattress is placed
on the bed frame.
It is important to note that
when moving the bed that
it is not dragged into its new
position to prevent the
possibility of these feet
being twisted or angled to
one side, which could lead
to the collapse of the centre
of the bed.
To move the bed, remove
the mattress and lift the bed
into its new position to avoid
damage.
Ensure the feet are at 90
the floor before replacing
the mattress.
Standard wooden slat system
Place the fixed wood slats
onto the slat holders on
side rails "3".
Fix the slats at both ends
and the middle using bolts "A"
sleeve nuts "B" and flat
washers "C",tighten
with allen key "D".
STEP 5
to
STEP 6
5
10mm
Dx1
Bx6
Dx1
Ax6
Cx6