3M SGLP200-CL-BP Installatiehandleiding - Pagina 3

Blader online of download pdf Installatiehandleiding voor {categorie_naam} 3M SGLP200-CL-BP. 3M SGLP200-CL-BP 17 pagina's. Reverse osmosis filtration systems
Ook voor 3M SGLP200-CL-BP: Handleiding voor installatie en gebruik (17 pagina's)

3M SGLP200-CL-BP Installatiehandleiding
• Where a booster pump is installed on a water system, you MUST maintain and
inspect the attached pressure switch regularly in accordance with the booster pump
manufacturer's instructions. Contact a plumbing professional if you are uncertain
how to maintain your booster pump system.
• Where a booster pump is installed on a water system, you MUST install an
appropriate pressure relief valve. Pressure relief valve must be maintained and
inspected every 6 months. Contact a plumbing professional if you are uncertain how
select/install/maintain a pressure relief valve.
• Where a booster pump is installed on a water system, you MUST install an
appropriate pressure regulating valve and regulate water pressure to <80 psi.
Contact a plumbing professional if you are uncertain how select/install/maintain a
pressure regulating valve.
• DO NOT install in direct sunlight or outdoors.
• DO NOT install near water pipes which will be in path of a drilling tool when selecting
the position to mount the bracket.
• Mount filter in such a position as to prevent it from being struck by other items used
in the area of installation.
• Ensure that the location and fasteners will support the weight of the system when
installed and full of water.
• Ensure all tubing and fittings are secure and free of leaks.
These systems are intended for use on feedwater meeting the following parameters.
Be sure to confirm that the feedwater falls within the limits shown below. If you're not sure
if this has been done, check with your distributor before installing the system.

Feedwater Parameters:

Feed TDS . . . Up to 2,000 ppm (mg/L)
Hardness* . . . . . <10 grains (171 mg/L)
Iron (Fe) . . . . . . . . . . . . . . . . . <0.1 mg/L
Hydrogen Sulfide . . . . .none allowable
Feed pH . . . . . . . . . . . . . . . . . . . . . . .4-11
Free chlorine . . . . . . . . . . . . . . <2 mg/L
Manganese (Mn) . . . . . . . <0.05 mg/L
Turbidity . . . . . . . . . . . . . . . . . . . <5 NTU
For areas with high dirt/sediment in incoming water, HF60-CL or HF90-CL pre-filter is recommended.
* NOTE: For waters over 10 grain hard, a 3M water softener is recommended for pretreatment. Consult 3M
technical services for correct sizing.
For areas with incoming pressure less than 60 psi an external Booster Pump is required.
FEEDWATER PARAMETERS
Pressure . . 60-125 psi (4 . 1 2 - 8 . 6 2 KPA)
Temperature . . . . .40-100°F (4 . 4 -38°C)
2