Annecy OTTOMAN TV BED Handmatig - Pagina 12
Blader online of download pdf Handmatig voor {categorie_naam} Annecy OTTOMAN TV BED. Annecy OTTOMAN TV BED 18 pagina's.
Electrical & Cable Connections
Stage
10
Press the "DOWN" button
to lower the TV lift.
Bed Assembly
Stage
11
IMPORTANT: Be careful to keep the two 2.8 mt HDMI Leads (17) on top of the Base Boards. Main power lead (15) and
Aerial lead (16) should be kept under the base boards & fed out under the headboard so you can connect to your wall
sockets.
13
13
Page 12 of 18
TV Power Lead
supplied with your TV
16
13
13