ATTACK FD20 Gebruiksaanwijzing - Pagina 11

Blader online of download pdf Gebruiksaanwijzing voor {categorie_naam} ATTACK FD20. ATTACK FD20 16 pagina's. Fd series. floor standing cast-iron solid fuel burning boiler

b) Assembly of the control rod of chimney flap
Assembly of the control rod of the chimney flap is done in this way::
- punch holes in the skeleton (in the right lateral side)
- insert the rod pos. 2 through the right lateral side
- at the end of the rod fix a ball pos. 3
- mount the lever pos.1 on the axis of the chimney flap.
- the rod pos. 2 insert into the lever pos. 1. Slip a washer pos.7 on the
rod from both sides. After slipping lock with a pin pos. 8. On the rod
put a screw, washer, and a nut pos. 4, 5 a 6. Tighten the screw slightly.
Test the function of the flap. If needed, adjust the angle of slipping and
tighten the screw firmly.

12. Brazier grid assembly

If needed ( the brazier grid is not supplied with the boiler), the assembly is carried out by following steps (fig.3):
- Preraziť the card on the side of the front element in the bottom part, between the front and intermediate element using a bit of
10
make a hole as in fig.3,
- place the back grid (12) in the combustion chamber,
- place the front (10) and block it to the hub (9) with the screws (8) and the nuts (7), block the front grid from the right
side of the boiler body with the screws (5)
- hook the tie rod (6) to the seats extracted from the front and rear grids (11).
- introduce the ring (4) and the lever (3) on the hub (9), fixing then everything with the washer (2) and the screw (1).
3
1
LEGEND
1 Left side
2 Right side
3 Posterior superior boardt
8
8
12
11
9
4
3
2
1
7
A
6
5
4
2
4 Protection deflector
5 Control board
6 Cover
Obr. 6
LEGEND
1 M8 x 10 screw
10
2 Washer
3 Grid lever
4 Ring for lever
5 M8 x 35 screw
5
6 Tie rod
7 M 10 nut
8 M 10 x 50 screw
9 Hub
10 Front grid
11 Intermediate grid
12 Rear grid
6
Ż 10 mm
B
11
Fig
. 3