2B Technologies 408 Handmatig - Pagina 5

Blader online of download pdf Handmatig voor {categorie_naam} 2B Technologies 408. 2B Technologies 408 7 pagina's. Portable n2o source

4) Connect the outlet of the regulator to the N
Figure 4. Diagram of the N

3. OPERATION

Please read all the following information before attempting to use the Portable N
Source. For assistance, please call 2B Technologies at (303)273-0559 or email us at
Shipping Box Contents
Open the shipping box and verify that it contains the following:
1. Piercing device with integrated pressure regulator and removable insert
2. Regulator mount
3. Two #10-32x1/2" Phillips head screws with split washers
4. One #10-32x1" socket cap screw with flat washer
5. Connecting tubing to instrument.
If anything is missing or obviously damaged, contact 2B Technologies immediately.
O inlet of the instrument.
2
Position top of regulator assembly so
that the mount clamps down in the
area indicated with arrows.
O source properly installed in the mount.
2
4
Portable N
O Source Manual Rev. B-2
2
O
2