AddEnergie SmartTWO Installatiehandleiding - Pagina 10

Blader online of download pdf Installatiehandleiding voor {categorie_naam} AddEnergie SmartTWO. AddEnergie SmartTWO 20 pagina's.
Ook voor AddEnergie SmartTWO: Snelstarthandleiding (4 pagina's)

Pedestal
Double & quadruple base installation
INSTRUCTIONS:
• Identify which sides of the main structures
must be assembled side to side and remove their
corresponding bolts and joining plates.
• Place the main structures one against the other
and join them together with the 2 bolts you
just removed.
• Assemble a stabilizer into the hole of the main
structure that is not fastened to the threaded
shaft anchor.
• Install the main structure over the concrete base.
Maintain a minimum of 3 cm (1.125") between the
bottom of the structure and the top of the base.
• Adjust the level of the structure through the nuts
attaching it to the base.
© 2019 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice
Piédestal double / Double pedestal
Plaque d'union
Joining Plate
3 cm
(1.125'')
Double pedestal
Piédestal quadruple / Quad pedestal
Quad pedestal
Vue de dessus
Top view
Vue de dessus
Top view
10