3onedata ICPE2600 Series Snelle installatiehandleiding - Pagina 2

Blader online of download pdf Snelle installatiehandleiding voor {categorie_naam} 3onedata ICPE2600 Series. 3onedata ICPE2600 Series 5 pagina's. Industrial outdoor 5g wireless router

1.
Wall Mounting or Pole Mounting location hole
2.
5.8G antenna interface
3.
5G Sub-6G antenna interface
4.
2.4G antenna interface
5.
10/100/1000Base-T(X) LAN port
6.
Terminal block for power input
7.
Grounding screw
8.
10/100/1000Base-T(X) PoE WAN port (PoE input)
9.
SIM card slot (SIM1, SIM2)
10.
Reset button
11.
Running indicator (RUN)
12.
WLAN indicator (WLAN)
13.
5G Indicator (5G)
14.
Gigabit WAN indicator (WAN)
15.
Gigabit LAN indicator (LAN)
16.
5G signal strength indicator(
17.
Breather valve

【Mounting Dimension】

Unit: mm
Notice Before Mounting:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging the
device.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.
【Pole-mounted Device Mounting】
Step 1
Use 4 M6 screws to install the clamp board as
shown in the figure below on the device backboard.
Step 2
Align the other clamp board with the hole center
line of the installed clamp board, then place the
support pipe to align the hole center of the two
clamp boards. When the two clamps are docking, it
can choose 15° or 90° installation angle.
Step 3
Pass the M6 long screw through the hole where the
clamp boards are docked and the support pipe, and
tighten the corresponding M6 nut.
Step 4
Install U-shaped derrick screws and derrick teeth
on the clamp board, and put the derrick with a
diameter of 40 mm - Ф Ф 50 mm in an U-shaped
slot, as shown in the figure below.
Step 5
Adjust device position and tighten the derrick nut to
fix the position of the device on the derrick.
Installation ends.