Ducoterra Radiant Heating Panel Installatiehandleiding - Pagina 5

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Ducoterra Radiant Heating Panel. Ducoterra Radiant Heating Panel 7 pagina's. Ducoterra radiant heating panel

Infrared Heating Solutions

Testing Installation

After installation, the heating circuit should be checked to ensure all panels have been installed properly and
are functioning normally. With power available, measure the branch load with an amp meter. The amp meter
value should agree with calculated load – if not, recheck the installation. A physical check of operation can
also be made – with power to the panels, they should be warm to the touch and prolonged contact should be
uncomfortable.
If no power is available to test the circuit, the use of an ohmmeter is required. Measure the resistance of the
load circuit, isolated from other circuits. The measured resistance of the heating circuit should match the
calculated resistance. The resistance can be calculated with the following formula:
=

WIRING DIAGRAMS

120 VOLTS
240 VOLTS
FIGURE 3 – Wiring connections for panels
855 Trosper Rd #108-331
Tumwater, WA 98512
(360) 207-4328 ● [email protected]