Duerkopp Adler 745-22 Installatie-instructies en lijst met reserveonderdelen - Pagina 13

Blader online of download pdf Installatie-instructies en lijst met reserveonderdelen voor {categorie_naam} Duerkopp Adler 745-22. Duerkopp Adler 745-22 14 pagina's.

Duerkopp Adler 745-22 Installatie-instructies en lijst met reserveonderdelen

4.5 Checking the Positioning

1
Before commissioning check the positioning set at the factory.
After turning on the main switch the sewing unit must position in
the needle high position (Position 2).
Checking the positioning
Turn the main switch off.
Bring the thread lever into a middle position by turning the
handwheel.
Turn the main switch on.
The sewing unit positions in needle high position (Position 2).
The thread lever must lie 2 mm behind its upper dead center.
Check the position of the thread lever.
If necessary correct the positioning.
Correcting the positioning
Loosen clamping screws 2 on the synchronizer.
Hold the synchronizer collar 1 tight.
Move the thread lever to 2 mm behind its upper dead center by
turning the handwheel.
Tighten the clamping screws 2.
Check the positioning again.
For the setting of the 1st needle position (needle low position)
see Service Instructions.
2
13