Anzzi Rhaus SP-AZ029 Installatiehandleiding - Pagina 6
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Anzzi Rhaus SP-AZ029. Anzzi Rhaus SP-AZ029 16 pagina's.
INSTALLATION (SETUP)
Figure A
IMPORTANT
Before drilling any holes for the shower panel brackets, ensure there are no hidden cables or
pipelines aligned with the desired drilling position.
Step A
Drill the two holes for the top bracket 1" apart at the desired height.
Step A.2
Drill the two holes for the bottom bracket 1" apart below the top bracket.
PERFECTION IS OUR TRADITION™
pg. 4