Anzzi SB-AZ011WC Installatie- en bedieningshandleiding - Pagina 8

Blader online of download pdf Installatie- en bedieningshandleiding voor {categorie_naam} Anzzi SB-AZ011WC. Anzzi SB-AZ011WC 14 pagina's. Shower base
Ook voor Anzzi SB-AZ011WC: Installatie- en onderhoudshandleiding (8 pagina's)

Anzzi SB-AZ011WC Installatie- en bedieningshandleiding
STEP 7
Allow the mortar to completely harden before applying weight to the bottom of the shower
tray.
Install the Drywall above the tile flanges and secure it to the studs.
Put the tiles (or other finishing wall material) over the drywall leaving 1/8" gap between the
bottom of the tile and the splash rim of the shower tray. Use caulk to fill that gap. (Fig.7)
Caulk
STEP 8
Apply a bead of sealant between the apron
and finished floor and wait for 24 hours
before using the shower. (Fig.8)
1
3
4
1/8"
gap
Base
Side View
Fig. 7
2
Waterproof Drywall to the
top of the tile flange
Stud
Drywall
Finished wall overlaps the
dry wall and tile flange
Fig. 8
2
e
6