Anzzi SD-AZ054-01 Series Installatie- en bedieningshandleiding - Pagina 16

Blader online of download pdf Installatie- en bedieningshandleiding voor {categorie_naam} Anzzi SD-AZ054-01 Series. Anzzi SD-AZ054-01 Series 18 pagina's. Tub door
Ook voor Anzzi SD-AZ054-01 Series: Installatie- en bedieningshandleiding (10 pagina's)

Step 11
1. Disassemble gaskets by removing handle knobs (Fig 11.1).
2. Install handle, washers and handle knobs to the Door Panel [05]. Tighten handle knob with
allen key to secure (Fig 11.2).
IMPORTANT: Ensure handle gaskets and washers are placed on each side of glass.
1
handle
Step 12
1. Apply a good quality Silicone Sealant at the
outer corner formed by the wall and the Wall
Post [01], and the outer corner formed by tub
deсk and Fixed Panel [04] (Fig 12).
Allow 24 hours for the silicone to
fully cure before using the shower.
14
handle knob
gasket
24
Hours
2
Fig 11
Allen Key
Fig 12