Dancover PRO EventZone 6x12m Handmatig - Pagina 4
Blader online of download pdf Handmatig voor {categorie_naam} Dancover PRO EventZone 6x12m. Dancover PRO EventZone 6x12m 14 pagina's.
____________________________________________________________________________________
1. General
Before assembling, workers should acquaint themselves with the safety precautions, necessary
implements and materials.
Safety Precautions:
A. The supervisor needs at least 6 assistants to set up the tent.
B. Before starting to work, the supervisor has to make his assistants familiar with the
sequence of operations and safety precautions.
C. He has to check that his assistants are qualified for this job and he is the responsible
leader on the site.
D. Everybody on the site should wear solid shoes and helmets.
E. The site should be insulated. The people except the workers are not allowed to enter into
the site.
F. If the foundation soil is of an inferior quality, it is necessary to obviate foundation breaking
danger by sufficient additional soil compression for expansion of the bearing surface.
G. Pay attention that the site is free of circuit and that there are no cables or pipes under the
ground.
H. In case any cables or other electric equipment is installed in the tents, electrical operation
rules should be strictly executed.
I.
Local safety precautions are applicable.
J.
Make sure the site is safe for the third party part. If the setup works is lasting for sections,
safety measures should be taken in the nights.
K. Tents fixing methods: In case of concrete ground and its heights exceeds 15cm, please
use Swell Screws or weight bags. In case of grass ground, bitumen ground (any other soft
grounds), please use steel Ground-Anchors.
L.
Please make sure the height difference of the site don't exceed 5cm, otherwise, it will
affect the safety of the tent.
Page 3 of 12