Duke FLEXBAKE 5 Gebruikershandleiding en installatie-instructies - Pagina 6

Blader online of download pdf Gebruikershandleiding en installatie-instructies voor {categorie_naam} Duke FLEXBAKE 5. Duke FLEXBAKE 5 16 pagina's. Ce integrated ventilation system

Owner's Manual and Installation Instructions for
FlexBake 5™ Integrated Ventilation System

UNPACKING AND INSTALLATION INSTRUCTIONS

TOOLS REQUIRED (NOT PROVIDED) FOR THIS INSTALLATION
STEP 1: UNPACKING
IVS Cover
b. Remove the screws securing the Exhaust
Ring and IVS Cover and remove these
parts from the assembly (save parts and
screws). Remove the 4 wood screws (2
per side flange) securing the IVS assembly
to the wooden slats and pallet. Carefully
remove any blocking and lift the IVS out
of the carton and inspect for any shipping
damage.
6
• Hammer
• Crowbar/Pry Bar
• Knife or Box Cutter
Crated View
Exhaust Ring
• #2 Phillips Screwdriver
• 5/16" Nut Driver
a. Carefully remove outer crating using
a hammer and crowbar/pry bar.
Remove carton top.
Foam Tape
c. Apply foam tape to underside of IVS on the flanges
as shown. Foam tape is packed along with the IVS
unit.