Duratuf GL75 Montagehandleiding - Pagina 3
Blader online of download pdf Montagehandleiding voor {categorie_naam} Duratuf GL75. Duratuf GL75 16 pagina's. Base size: 2.190m x 1.520m
CONGRATULATIONS ON PURCHASING A DURATUF GUARDIAN SHED.
BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS
•
Read all instructions carefully
•
Identify all parts and check quantities against parts list
•
Select a level site
•
Do not mark cladding with pencil as lead can cause corrosion to cladding
•
During assembly, ensure all drill filings are removed between layers of steel, before riveting together
•
Do not attempt to build your shed in high winds
•
Beware of sharp edges, we recommend that you use gloves
•
Protect your eyes and ears
•
For ease of assembly, use a friend to help
DRILL
HAMMER
The following maintenance process needs to be adhered to, to qualify for the steel warranty of your Duratuf Guardian
shed.
•
Wash all surfaces annually using a hose and soft nylon brush.
•
Within 2 km of coast – wash every 3 months as above. After a storm, wash the cladding and the gutters as soon
as possible to remove any highly corrosive salt deposits.
•
Volcanic Ash Fallout – wash as soon as possible, removing fall out from roof and gutters.
•
Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding
BEFORE YOU START:
SAFETY:
TOOLS REQUIRED:
RIVETER
SQUARE DRILL BIT
NAIL PUNCH
TAPE MEASURE
WARRANTY REQUIREMENTS:
3.5mm DRILL BIT
HEX DRIVE
2
LADDER
SKILL SAW
(timber floor only)
.
: