Duratuf KL1 Montagehandleiding - Pagina 10

Blader online of download pdf Montagehandleiding voor {categorie_naam} Duratuf KL1. Duratuf KL1 16 pagina's. Kiwi series

Duratuf KL1 Montagehandleiding
Note:
Condensation can form on the under side of shed roof. If building paper is required, fit now. Building paper
will need to be supported by netting or roofing twine.
Roof with Clear Panel: Handle Clear Panel with care. The Clear Panel will crack if not fitted correctly.
Riveting: Pre-drill 3.5mm hole through Clear Panel and Steel. Enlarge hole in Clear Panel with drill to allow
for expansion and contraction.
Nialing: Pre-drill a 6mm hole through the Clear panel. Hammer in nails with caution.
Step 1: Check that the diagonal measurements of the shed are the same. If building on unlevel ground it may be
necessary to temporarily brace the shed with pieces of timber from the packaging.
Step 2: Position first Roof Sheet on the right
hand side of the shed with the LIP on
the left hand side. Position the next
Roof Sheet. Ensure it overlaps correctly
(when fitting a Clear Roof Panel, ensure
it OVERLAPS Roof Sheets). Rivet sheet
joins 500mm from edge, front and back.
Position and rivet remaining sheets.
Step 3: Position roof so that the front overhang
measures 140mm. Line up Ribs on the
Roof Sheets with Ribs on the Wall
Sheets. Ensure plates are straight then
nail roof to plates using one weatherseal
nail beside each Rib front and back.
KL3 ROOF
10
Note: KL1 shown