Duratuf KIWI KL1 Montagehandleiding - Pagina 12

Blader online of download pdf Montagehandleiding voor {categorie_naam} Duratuf KIWI KL1. Duratuf KIWI KL1 16 pagina's.

Step 1: Position Barge Flashing (G102) on gable
ends. Position a Spouting (A103) and rivet
to the Barge Flashing at each end. Repeat
with other Spouting.
KL1 BARGE & SPOUTING
Step 2: Centralise Barge Flashing on end and
rivet in place, one rivet into every second
Rib. Fit two rivets through top of Barge
into Rib. Repeat with other Barge Flash-
ing. Check Spoutings are straight, then
rivet to Roof one rivet every second Rib.
12