4CR ECO IR 1 Bedieningshandleiding - Pagina 5
Blader online of download pdf Bedieningshandleiding voor {categorie_naam} 4CR ECO IR 1. 4CR ECO IR 1 10 pagina's. Infrared dryer
3. Installation
1. Installation of the substructure:
a. Remove the substructure from the packaging.
b. Place the substructure on the ground.
c. Attach the four wheels to the base and tighten the screws.
d. Make sure the rollers with brakes are mounted on the back of the substructure.
2. Installation of the column:
a. Remove the column from the packaging.
b. Place the column vertically on the base and screw it together.
Installation of the lamp bracket:
a. Remove the lamp bracket from the packaging.
b. Connect the lamp bracket to the column and screw it tight.
c. Connect the control cables and adjust the angle of the lamp bracket.
Further information can be found on page 2.
3