Duro Dyne RH Mach III Gebruikershandleiding - Pagina 10

Blader online of download pdf Gebruikershandleiding voor {categorie_naam} Duro Dyne RH Mach III. Duro Dyne RH Mach III 20 pagina's. Rolling head pinspotter

INSTALLATION INSTRUCTIONS

1) For the Mach III-
Connect the Power Pack to a source of 208-240V 60 Amp. power. This service should be connected to a
60 amp disconnect box fitted with 60 amp slow blow fuses.The Power supply line to the power pack pigtail
should be #6 (or heavier) wire to minimize voltage losses. The black and white wires are the power, the
green is ground. Select 208V or 240V at the voltage switch in the triangle enclosure to the closest match
to the power supply voltage.
2) Attach the Actuator Arm to the socket on the top of the Trolley.
3) Connect the air line to the Regulator. Adjust the regulator pressure to 80-85 PSI.
4) Plug the Vibrator Power Plug into the socket on the rear of the Control Panel.
OPERATION
Mach III INITIAL ADJUSTMENTS
1) Turn the power switch to "ON".
2) Turn the vibrator switch to "ON".
3) Add the weld pins to the hopper (Vibrator Bowl).
4) Adjust the vibrator speed so that the weld pins climb the spiral track inside the vibrator bowl without
vibrating off.
5) When the weld pins fill the track up to the Vibrator Sensor, the vibrator automatically shuts off.
6) Flip the HEAD TEST Switch to either the "WELD #1" or "WELD #2" position.
NOTE: The Rolling Head Mach III Pinspotter has two redundant weld circuits. In the event that the solid
state relay controlling the weld fails you may simply flip the switch to the other circuit and continue
production. A replacement Weld Relay should then be ordered through your local Duro Dyne wholesaler.
TECHNICAL SPECIFICATIONS
RH Mach III
AIR REQUIREMENTS:
Input pressure 80 PSI.
ELECTRICAL:
Input voltage: 208-240 V 60 HZ
single phase. 60 amp service
Fuse for 60 amps. using slow blow fuses
-10-