CB2 PEZZO Montage-instructies

Blader online of download pdf Montage-instructies voor {categorie_naam} CB2 PEZZO. CB2 PEZZO 4 pagina's. Stacking storage unit

pezzo
STACKING STORAGE UNIT / BENCH
Thank you for purchasing the Pezzo Stacking Storage
Unit / Bench. This page lists all the contents included in
the box. Please take the time to identify the hardware as
well as the individual components to this product. As you
unpack and prepare for assembly, place the contents on a
carpeted or padded area to protect them from damage.
Note: 2 people are recommended to safely assemble this product.
components
1 - top panel
1 - bottom panel

tools required

(We recommend the use of hand tools instead of power tools)
Made in Vietnam - r05
Customer Service 800.606.6252 | Latest instructions available at www.cb2.com
assembly hardware
4 - small
2 - flat
bolts
washers
16 - cam
16 - cams
screws
mounting hardware
4 - large
4 - small
4 - plastic
screws
screws
anchors
Missing hardware?
Please call 800.606.6387 for replacements.
2 - partitions
2 - side panels
phillips head screwdriver
2 - spring
2 - large
washers
bolts
(attached in side panels)
8 - small
2 - metal
16 - cam
screws
plates
covers
2 - wall
4 - mounting
straps
brackets
1 - fixed shelf
1 - leg
allen wrench (included)
Page 1 of 4