Datapath VSN1100 Series Snelstarthandleiding - Pagina 11
Blader online of download pdf Snelstarthandleiding voor {categorie_naam} Datapath VSN1100 Series. Datapath VSN1100 Series 13 pagina's. Wall controller
STEP 7 POWERING UP THE SYSTEM
1
Connect power cables then plug into a mains supply.
2
Switch on the power supply units.
If you have an VSN Expansion Chassis connected to the main unit then the power
supply units on the expansion chassis should be switched on prior the main unit.
There is no requirement to "switch on the system" (3) on an expansion chassis.
Page 6
3
Switch on the system.