Blader online of download pdf Handmatig voor {categorie_naam} BENDIX DUAL RELAY VALVE. BENDIX DUAL RELAY VALVE 4 pagina's. Dual relay valve

2. Inspect all air lines connected to the Dual Relay Valve
for signs of wear or physical damage. Replace as
necessary.
3. Test air line fi ttings for excessive leakage and tighten
or replace as necessary.
4. Perform the Leakage Test described in this manual.
Every year, 100,000 miles, or 3,600 operating hours:
1. Perform the Operation and Leakage Tests described
in this manual.
GENERAL SAFETY GUIDELINES
WARNING! PLEASE READ AND FOLLOW
THESE INSTRUCTIONS TO AVOID PERSONAL
INJURY OR DEATH:
When working on or around a vehicle, the
following general precautions should be observed
at all times.
1. Park the vehicle on a level surface, apply the parking
brakes, and always block the wheels. Always wear
safety glasses.
2. Stop the engine and remove ignition key when working
under or around the vehicle. When working in the engine
compartment, the engine should be shut off and the
ignition key should be removed. Where circumstances
require that the engine be in operation, EXTREME
CAUTION should be used to prevent personal injury
resulting from contact with moving, rotating, leaking,
heated or electrically charged components.
3. Do not attempt to install, remove, disassemble or
assemble a component until you have read and
thoroughly understand the recommended procedures.
Use only the proper tools and observe all precautions
pertaining to use of those tools.
4. If the work is being performed on the vehicle's air brake
system, or any auxiliary pressurized air systems, make
certain to drain the air pressure from all reservoirs
before beginning ANY work on the vehicle. If the
vehicle is equipped with an AD-IS
a dryer reservoir module, be sure to drain the purge
reservoir.
5. Following the vehicle manufacturer's recommended
procedures, deactivate the electrical system in a
manner that safely removes all electrical power from
the vehicle.
6. Never exceed manufacturer 's recommended
pressures.
7. Never connect or disconnect a hose or line containing
pressure; it may whip. Never remove a component or
plug unless you are certain all system pressure has
been depleted.
®
air dryer system or
8. Use only genuine Bendix
components and kits. Replacement hardware, tubing,
hose, fi ttings, etc. must be of equivalent size, type
and strength as original equipment and be designed
specifi cally for such applications and systems.
9. Components with stripped threads or damaged parts
should be replaced rather than repaired. Do not
attempt repairs requiring machining or welding unless
specifi cally stated and approved by the vehicle and
component manufacturer.
10. Prior to returning the vehicle to service, make certain all
components and systems are restored to their proper
operating condition.
11. For vehicles with Antilock Traction Control (ATC),
the ATC function must be disabled (ATC indicator
lamp should be ON) prior to performing any vehicle
maintenance where one or more wheels on a drive
axle are lifted off the ground and moving.
OPERATION & LEAKAGE TESTS
LEAKAGE TESTS
1. Fully charge the air system making certain that the rear
service reservoir is fully charged.
2. With the system fully charged, check for leakage at the
rubber exhaust fl ap of the valve. Coat the exhaust fl ap
with a soap solution. A 1 inch bubble in not less then 3
seconds is permitted (175 sccm max.).
3. Make a full brake application and hold it while checking
for leakage at the rubber exhaust port check of the
valve. Coat the exhaust port with soap solution. A 1
inch bubble in not less then 3 seconds is permitted
(175 sccm max.).
OPERATION TESTS
General
To complete the operational tests two accurate test gauges
and the appropriate fi ttings to "tee" the gauges into the
various lines are required. Testing requires that one gauge
be installed and remain in the line connected to the delivery
port 22 throughout the operational testing. The second
gauge will be alternately installed in the primary control line
leading to port 41 and the secondary control line leading
to port 42.
1. Install the gauge in the delivery line leading to port
22.
2. Install the gauge in the primary control line leading to
port 41.
3. Remove and PLUG the line leading to the secondary
control port 42.
®
replacement parts,
3