Bretford MSB-C144 Montagehandleiding - Pagina 4
Blader online of download pdf Montagehandleiding voor {categorie_naam} Bretford MSB-C144. Bretford MSB-C144 9 pagina's. Power pole substation liquid workspace
Determine the exact floor location, the orientation of the oval cutout and the center of
the Substation which the power pole will mount onto. Position Substation and mark
floor. Use a plumb line to locate the center and the direction of oval cutout on the ceiling
required to allow the power pole to pass through the ceiling. Mark center and high
points of oval cutout on the ceiling.
Position the oval escutcheon ring using the marks on the ceiling and assuring the oval is
orientated correctly to match the oval in the Support. Trace the inside oval and mark mount-
ing hole locations. Cut oval shape along line with cutting blade positioned outside the line.
Drill 4 holes for recommended 1/4" dia. expansion bolts. Bolts pass thru or fasten
into(drywall).
Power Pole
Escutcheon Ring
Top Cover
Slide oval Escutcheon Ring and Top Cover over power pole (Fig. 3).
STEP 3
STEP 4
Substation
end.
Fig. 3
STEP 5