Dymec 5941D1 Installatieprocedure - Pagina 2

Blader online of download pdf Installatieprocedure voor {categorie_naam} Dymec 5941D1. Dymec 5941D1 2 pagina's.

One or Two Links can be used for testing. Links may be statically tested without being connected to IEDs as follows:
1. Connect the Links as described in the installation instructions steps 1, 3, 4, 5 and 6 or connect a short length of
simplex fiber cable from the T to the R receptacle of the unit to test.
2. Instead of connecting an IED for the signal and control source described is Step 2, a 9volt battery can be connected
to the "local" Link and a dc volt meter connected to the "remote" Link. Connect the battery (-) terminal to Pin 5 of the
"local" Link and the meter (-) lead to Pin 5 of the "remote" Link or pin 5 of the local link if Loopback is used.
3. With the Links connected and synchronized, "SYNC" LED on steady, test per the following table:
At The Local Link
Apply (+) 9 Volts to
Pin 1
Pin 2
Pin 3
Pin 4
*The meter will read > (-) 5 volts until the signal is applied to the Link at the "local" end.
**If Switch 2 CH 3 is set for IRIG-B (not factory default) Pin 8 will read ~0 volts
4. Next, if channel 4 is not used for data, open the switch access on the top of the Link and set switch 1 to the sync
position. Then connect the meter to pin 9 of the "remote" Link. The meter should read >(+) 5 volts while the Links are
synchronized. With the meter still connected, disconnect one of the fibers. The "Sync' LED turns off and the meter
reads >(-) 5 volts.
5. Interchange the "local" Link with the "remote" Link and re-test; following all the above steps if two links are used.
Note: Dynamic functional testing can only be achieved by using an IED connected to each Link. This allows full
communication dynamics to verify system operation including data passing, control and timing.
If the optical link does not operate properly, use the following check list:
1. Are both Links powered properly? - Are "POWER ON" LEDs illuminated?
2. Is the "SYNC" LED off? (Links are not synchronized)
Check the FOC connections - Are both fibers connected "T" to "R" - not "T" to "T" nor "R" to "R"?
Are both Fibers the same length (within a meter)?
Check FOC and terminations for continuity
Consult factory
3. Is the "SYNC" LED on steady? (Links are synchronized)
Check the Channel "T" LEDs of the local Link - are they illuminated?
NO - Re-check connections to IED for function and signal direction (Input Vs Output)
YES - Are the corresponding Channel "R" LEDs of the remote Link illuminated?
NO - Consult factory
YES - Re-check connections to IED for function and signal direction (Input Vs Output)
4. Are the IEDs set at the same baud rate?
5. Are all the IEDs logic and control functions satisfied? - Check IED's "Description Of Operation"
6. Consult Factory - Please have the IED instruction book available along with your connection diagram to the Link.
DO NOT ATTEMPT TO DISASSEMBLE LINKS AS THERE ARE NO SERVICEABLE PARTS WITHIN.
3-40-0012-01
TESTING
At The Remote Link*
or If Loopback is used the Local Link*
LED Illuminates
Meter Reads > (+) 5 Volts on
CH1 T
CH2 T
CH3 T
CH4 T
until the signal is applied at the "local" end

TROUBLESHOOTING

THIS ACTION WILL VOID THE WARRANTY.
LED Illuminates
Pin 6
Pin 7
Pin 8**
Pin 9
25 Commerce Way #1 North Andover, MA
Phone 978-688-8807 • Fax 978-688-8771
CH1 R
CH2 R
CH3 R
CH4 R
01845
IS5941 • Rev AD
www.dymec.com
Printed in USA