Great Lakes SR Series Handleiding voor installatie-instructies - Pagina 7

Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Great Lakes SR Series. Great Lakes SR Series 12 pagina's. 19" eia wall mount swing rack
Ook voor Great Lakes SR Series: Handleiding voor installatie-instructies (8 pagina's)

Great Lakes SR Series Handleiding voor installatie-instructies
UNIVERSAL
The 19" EIA Swing Frame Rack can be hinged (retractable pin) on either side.
Customer needs to determine which side is to open. To open, simply retract
8
7
both pins (top and bottom) and then open the Swing Frame Rack similar to
that of a door.
LEFT HAND SWING
CAUTION:
LEFT HAND
When installing 19" EIA equipment, make sure both retractable pins (2) are
secured into the rear section that has been mounted to the wall. Be sure
8
7
all screws, nuts, and mounting hardware are tightened before loading with
equipment.
6
6
8
D
C
B
Secure retractable pins into
A
receptacle (2 locations)
8
5
4
OR
RIGHT HAND SWING
5
7
4
7
3
RIGHT HAND
6
3
5
6
5
2
1
2
1
4
7
4
D
C
B
A