Great Lakes GL600E-2432 Handleiding voor installatie-instructies - Pagina 4

Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Great Lakes GL600E-2432. Great Lakes GL600E-2432 13 pagina's. Equipment cabinet/rack

Great Lakes GL600E-2432 Handleiding voor installatie-instructies

INSTALLATION

Receiving, Unpacking, and Removing the E cabinet from the Pallet
Inspect and report any damage before receiving. Unpack the cabinet
by carefully removing the corrugated carton and corners. Avoid
damaging the cabinet when removing packaging.
WARNING: Only trained service personnel should be used to remove
the cabinet from the pallet. Also, be sure you have a sufficient number
of service personnel. Do not attempt to move cabinets by yourself.
WARNING: Be careful when moving cabinets before installation.
Sudden stops and starts, excessive force, obstructed routes, and
uneven floor surfaces may cause the cabinet to topple over.
Loading Equipment
WARNING: Only install equipment after the E cabinet has been
properly secured. Do not move the E cabinet assembly while loaded.
Once in place at the desired/intended location, deploy the leveling feet
for maximum stability.
Rated or maximum load capacity for the GL300E is 300 lbs. and the
maximum load capacity for the GL480E and GL600E is 600 lbs.
To maintain a uniform distribution of the mechanical load in the
E cabinet, load the heaviest equipment first, at the bottom of the
E cabinet and load the lighter units at the top.
4