Great Lakes GL840N12-3042-SS Handleiding voor installatie-instructies - Pagina 5
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Great Lakes GL840N12-3042-SS. Great Lakes GL840N12-3042-SS 16 pagina's. Nema enclosures
OPERATING DOOR HANDLE
As part of the NEMA 12 design the front and rear doors are set up with
three point latching doors. The door handles have been installed at the
manufacturer. No additional assembly is required. To operate the door
handle turn it to the right to open. This will release the top, bottom and
center door compression. To close the door have the handle in the open
position put slight pressure on the door against the enclosure frame to
make sure all three points will close and return the handle to the vertical
position.
Can accommodate
3/8" hasp lock
A
SIDE PANEL REMOVAL
WARNING: Side panels should not be removed if an air conditioning
(A/C) unit is attached. Remove A/C unit before removing side panel.
Side panels are secured to the frame using #10-32 screw into a blind
#10-32 stand-off; there are screws in 12 locations.
#10-32 blind
stand-off x 12
Removable A/C
side panel
#10-32 Pan
Screw x 12
5