Great Lakes Case & Cabinet VCM5-FO Handleiding voor installatie-instructies - Pagina 4
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Great Lakes Case & Cabinet VCM5-FO. Great Lakes Case & Cabinet VCM5-FO 8 pagina's. 5" vertical cable management & accessories
INSTRUCTIONS FOR BRACKET SET A1
1. Align the channel mounting
brackets with the equipment rack
(Figure 1).
2. To secure the channel in place,
push the supplied #12-24 screws
through the mounting bracket and
screw into the equipment rack.
3. When assembling the 80"
channel, carefully align the
connecting tabs (Figure 2).
4. To install the cover(s), fit the
cover over one side of duct fingers
FIGURE 1
and rotate the cover to the other side
until it snaps into place.
NOTE: The channel fingers can
be bent outward and snapped off
to more easily run cables from the
vertical to the horizontal channel.
FIGURE 2
MOUNTING BETWEEN
TWO RACKS
When center mounting the
VCM5 between any two of
the A1 compatible racks, a
second set of A1 Brackets
should be used, so that there
are 4 brackets installed on
the left and right side of
the channel. Optional Part
No. VCM5-BKT, consists of
4, A1 brackets and should
be used with center mount
applications.
4