Great Little Trading L4975 Snelstarthandleiding - Pagina 5
Blader online of download pdf Snelstarthandleiding voor {categorie_naam} Great Little Trading L4975. Great Little Trading L4975 8 pagina's. Coffee cup wooden play kitchen
Hardware for Step 5:
2x #3 barrel nuts
#3
2x #4 barrel nut bolts
#3
STEP 5:
Secure left hand side panel (H) to base panel (I) using 2x barrel nuts and bolts.
H
K
I
#4
#4
STEP 6:
Loosely attach right hand side panel (J) to base panel (I) using 2x barrel nuts and
bolts. With the panel J loosely attached now slide front plinth (K) into the dowel
holes on the inside faces of panel H and J.
With panel K now in place, now fully tighten the barrel nut bolts to fully secure
right hand side panel (J) to base panel (I).
H
#4
I
#4
Hardware for Step 6:
2x #3 barrel nuts
2x #4 barrel nut bolts
J
#3
#3
Hardware for Step 7:
2x #3 barrel nuts
2x #4 barrel nut bolts
Loosely tighten
Do not fully tighten
#3
STEP 7:
Secure dividing panel A to base panel (I) using 2x barrel nuts and bolts. Do not fully
tighten. You will need the panel to be slightly loose in order to complete step 8.
STEP 8:
Gently push the dowels
on washing machine door
panel (L) into the holes on
the internal faces of panel
H and A.
Now slot the oven tray
(M) into the slots on the
internal faces of panels J
and A.
With panels L and M in
position. Now fully tighten
the barrel nuts and bolts
securing panel A to I.
5
A
#4
#4
I
#3
L
M
H
A
J
Now fully
tighten