DAYLIFF DB 12-50 Installatie- en bedieningshandleiding - Pagina 8

Blader online of download pdf Installatie- en bedieningshandleiding voor {categorie_naam} DAYLIFF DB 12-50. DAYLIFF DB 12-50 13 pagina's.

DAYLIFF DB 12-50 Installatie- en bedieningshandleiding
4) PRIMING
Serious damage will occur if a pump is not properly primed
and runs without water.
WARNING
The pump must be primed before operation. To do this completely fill the
pump housing with clean water through the priming plug before switching it
on.
When full replace the priming plug and start the pump checking there is a
steady flow at the pump outlet. The pump should be primed whenever it has
not been used for a long period of time or when air has made its way into
the system.

5. MAINTENANCE

Never carry out any work on the pump without having first
disconnected from the mains supply.
WARNING
Pumps do not require routine maintenance provided the following
precautions are taken:-
Check that the foot valve is clean and unrestricted at regular intervals.
Ÿ
If the pump is to remain unused for long periods of time it is advisable to
Ÿ
empty it completely, rinse it with clean water and store in a dry place.
If the shaft does not run freely, release it using a screwdriver by inserting it
Ÿ
in the special slot on the rear of the pump shaft. If this is not sufficient to
solve the problem remove the pump body by unscrewing the relevant
mounting bolts and clean it thoroughly to remove any encrustation.
5