Emerson FB2100 Handleiding veldvervanging - Pagina 5

Blader online of download pdf Handleiding veldvervanging voor {categorie_naam} Emerson FB2100. Emerson FB2100 14 pagina's. Flow computer i/o terminal board
Ook voor Emerson FB2100: Handleiding veldvervanging (16 pagina's), Handleiding veldvervanging (8 pagina's), Handleiding veldvervanging (16 pagina's), Handleiding veldvervanging (16 pagina's)

Emerson FB2100 Handleiding veldvervanging
FB2100/FB2200 Flow Computer Doors/Accessories Field Replacement Guide
3.
When the screws and washers are removed, pull the old display/cover assembly off and set it
aside.
4.
Peel off any residual gasket material which might be stuck to the outside of the enclosure
door.
5.
Align the new display/cover assembly with the outside of the enclosure door, and use the
screws and washers to attach it from the other side of the door. Torque screws to 4 to 6 in-
lbs (0.5 to 0.7 N m).
6.
Close the flow computer enclosure.
D301825X012
November 2020
3