Emerson FB2200 Handleiding veldvervanging - Pagina 7

Blader online of download pdf Handleiding veldvervanging voor {categorie_naam} Emerson FB2200. Emerson FB2200 8 pagina's. Flow computer i/o terminal board
Ook voor Emerson FB2200: Handleiding veldvervanging (16 pagina's), Handleiding veldvervanging (8 pagina's), Handleiding veldvervanging (14 pagina's), Handleiding veldvervanging (16 pagina's), Handleiding veldvervanging (16 pagina's)

Emerson FB2200 Handleiding veldvervanging
FB2200 Flow Computer 8-Channel Expansion I/O Board Field Replacement Guide
1
Screws
2
Posts
6.
Carefully place the new (replacement) 8-channel expansion I/O board on the posts, and
gently press it down onto the I/O termination board. Attach it using the four screws you
removed in step 5. Torque screws to 1 to 2 in-lbs. (0.1 to 0.2 N-m).
7.
Take the CPU enclosure (with the HMI module attached) and line up the CPU enclosure's
captive fastening screws with their matching holes on the I/O assembly. Press the enclosure
screws onto the holes and hold it there while tightening each of the captive fastening screws.
Torque screws to 7 to 9 in-lbs. (0.8 to 1.0 N-m).
8.
Connect the intermediate cable to the sensor module and make sure it has clearance.
9.
Plug in TB2 (pins 1,3,5,7) to restore power.
10.
Close the enclosure door.
D301804X012
November 2020
5