Galvin Engineering CLEVAKIT1CP Handleiding voor installatie-instructies - Pagina 5
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Galvin Engineering CLEVAKIT1CP. Galvin Engineering CLEVAKIT1CP 6 pagina's. Hand shower kit
Product Installation Guidelines
8. Fit handle
−
Ensure the spindle is in the closed
position and firmly press the lever handle
onto the spindle in the desired
orientation.
−
Check operation of lever handle. It
should turn freely for a full ¼ turn.
−
Secure the handle in position using the
supplied washer and stainless-steel cap
screw.
TROUBLESHOOTING
PROBLEM
Water is not flowing or
inconsistent flow
Leak from hose
connection
Taps are dripping water
Water is leaking from
spindle
Water is not flowing from
tap
Spindle is difficult to turn
Handle is loose
Flange does not screw
down onto wall surface
© Galvin Engineering Pty Ltd
9. Fit water temperature indicator & Test
CAUSE
Shower arm is blocked with
debris.
Hose connection loose
Ceramic discs are worn or
damaged
Tap seat is damaged
O-ring on jumper valve spindle
is damaged or worn
Water is turned off
Aerator or flow regulator is
blocked by debris
Build up of scale on spindle,
spindle worn or o-ring has
been damaged
Screw has come loose
Wall bodies are set too far out
−
Once the lever handle is secure; fit the
Version 1, 1 June 2022, Page 5 of 6
appropriate water temperature indicator.
−
Check the operation of the unit and inspect
for any leaks.
RECTIFICATION
Remove debris from shower arm.
Check wall coupling locates properly with
hose connection.
Remove and inspect SBA. Remove
debris and/or replace SBA if damaged.
Refurbish tap seat using a reseating tool.
Replace o-ring
Turn on water
Remove aerator and/or flow regulator
from tap and remove debris. Install an
inline strainer.
Remove cartridge sleeve, clean and
regrease. Replace o-ring. Complete SBA
may need to be replaced.
Tighten handle screw
Re-position tap bodies
th
Version 1, 25
May 2022, Page 5 of 6