Galvin Engineering CliniLever TCWSC80C Installatie Manuals - Pagina 2
Blader online of download pdf Installatie Manuals voor {categorie_naam} Galvin Engineering CliniLever TCWSC80C. Galvin Engineering CliniLever TCWSC80C 5 pagina's. Hospital wall sink set taps w/ 190 gooseneck outlet
Product Installation Guidelines
PRE-INSTALLATION -
In-wall valve body
In-wall valve body must have G5/8"
−
female
connection.
−
Body should be mounted between 0
and 15mm behind the finished wall
surface.
© Galvin Engineering Pty Ltd
MOUNTING DETAILS
head
to
body
thred
TCWSC150C/TCWSJ150C
Wall spud
Wall spud must be ½" BSP male thred and
-
protrude from the finished wall by no more than
15mm
Note: In some situations, a male thread
connection on the spout may be more suited. If
so, please contact us on 1300 514 074
Note: Before installation, all lines must be flushed. We
recommend that a line strainer be installed prior to taps
to eliminate any foreign material.
TCWSC80C/TCWSJ80C
Document No.: 001.00.10.08
Version 1, 12 July 2022, Page 2 of 5