AGS Parksafe Control Panel Installatie-, bedienings- en onderhoudshandleiding - Pagina 9

Blader online of download pdf Installatie-, bedienings- en onderhoudshandleiding voor {categorie_naam} AGS Parksafe Control Panel. AGS Parksafe Control Panel 20 pagina's. Ventilation control panel
Ook voor AGS Parksafe Control Panel: Installatie- en bedieningshandleiding (16 pagina's), Installatie- en bedieningshandleiding (16 pagina's), Installatie, bediening en onderhoud (16 pagina's)

AGS Parksafe Control Panel Installatie-, bedienings- en onderhoudshandleiding
Installation, Operation & Maintenance
ParkSafe Controller

ParkSafe Detector 'ID' Switches

All detectors are factory set to ID 1!
We recommend a plan, map and/or marking the detector enclosures detailing ID and location!
ID Switches must be configured for each detector to receive and display accurate data!
When wiring multiple detectors, it is important to identify each detector installed for
the controller to receive and display accurate data corresponding with the correct
device. The ID configuration diagram is printed on the ParkSafe detector circuit
boards for quick reference as shown opposite. All detectors are factory set to ID1.

120ohm Termination Resistance

Signal communication issues may occur where the bus length is too long, high baud rates
are used, or signal reflections are occurring. To avoid this, terminating at each end of a
detector chain may help the quality of the data signal by turning on the 120-ohm terminal
resistor switch.
If a split chain is used, terminate the last detector in each chain. If a single chain is used,
terminate the first device (ParkSafe Controller) and last device (ParkSafe Detector).
Split chain
Single chain

Access Configuration Settings

When changes are made – turn the settings switch off and the controller will automatically restart!
Access to the interior of the controller, when carrying out any work, must be conducted by a competent person!
Before carrying out any work ensure local regulations and site procedures are followed!
Turn on the [Settings] switch located on the display circuit board. The screen will display the settings menu.
The ParkSafe controller has a touch screen, which allows the engineer/user to configure the system.
Adjust the screen brightness
Change/select option
(Press or slide the cursor up and down)
(Press the blue option box or press and hold)
Rev: 20
9