Maiwe MIEN2024 Gebruikershandleiding - Pagina 11

Blader online of download pdf Gebruikershandleiding voor {categorie_naam} Maiwe MIEN2024. Maiwe MIEN2024 18 pagina's. Rack mount industrial ethernet switch

MIEN2016/2018/2024/2026 Rack Mount Industrial Ethernet Switch
Figure 2-5 Schematic diagram of the installation dimensions of MIEN2016 and
The installation dimensions of MIEN2018-2S/M and MIEN2026-2S/M are
shown in Figure 2-6.
Figure 2-6 Installation dimensions of MIEN2018-2S/M and MIEN2026-2S/M
For most industrial applications, 19-inch rack installation is very
convenient. The installation situation of the rack should be checked before
installation. It mainly includes the following two contents:
Is there enough space for installing this product
Is there a power supply suitable for the work of this product
When installing, first determine the installation position of the product,
align the mounting holes of the switch with the holes on the rack, and fix it with
4 screws. The recommended specification is M5*14.

2.2.3. Cable connection

After the correct installation, the cables can be installed and connected,
mainly including the cable connections of the following interfaces.
Working interface
MIEN2024
- 7 -