Centrometal EKO-CK P 40 Technische instructies - Pagina 3

Blader online of download pdf Technische instructies voor {categorie_naam} Centrometal EKO-CK P 40. Centrometal EKO-CK P 40 20 pagina's. Hot water boiler
Ook voor Centrometal EKO-CK P 40: Gebruik en onderhoud (20 pagina's)

Centrometal EKO-CK P 40 Technische instructies
The boiler EKO-CK P with equipment for wood pellets firing (Cm Pelet-set)
TM
3
O F F
08:42
1
0
GV
4
CD
1
DV
2
B
E
U
TP
LEGENDE:
1 - Boiler EKO-CK P
Cm Pelet-set:
2 - Pellet burner CPPL
3 - Pellet control unit CPREG
4 - Pellet tank CPSP
5 - Feeder screw CPPT
Technical instructions EKO-CK P
TU
PVL
5
DP
OC
PVV
PR
PC
A
D
NOTE:
Pellet tank CPSP can be
ZA
positioned on the left side
Of the boiler (in this case
is necessary to turn supply
tube for pellet loading on the
GR
burner CD for 180°).
CE
DV
-
Lower boiler door
GV
-
Upper boiler door
TM
-
Thermometer
PRA
-
Filling / drainage
PVV
-
Outlet line
OC
-
Cleaning opening
DP
-
Chimney connection
PVL
-
Inlet line
TU
-
Sensor sleeve
PC
-
Plastic flexible pipe
U
-
Socket of the pump thermostat
TO
-
Thermal protection connectors
(not used on boiler with installed
Cm Pelet-set)
TP
-
Pump thermostat
ZA
-
Poker
GR
-
Scraper
CE
-
Cleaning brush
CD
-
Supply tube for pellet loading
Dimensions
TO
U
DP
OC
PVV
PR
3