11. D10/D10 Turbo Operator Installation
Correct access in and out of the premises
Endstops are mandatory and must be capable of stopping the
gate at rated speed
Guide-rollers and anti-lift brackets are correctly fitted
The gate mass, starting- and rated-pull-force limitations are not
exceeded
The D10/D10 Turbo is positioned correctly and does not
protrude into the driveway
Locate operator position
1.
To ensure operator does not
protrude into driveway, install
foundation plate at least flush
with the driveway entrance.
2.
Determine a suitable position
and vertical height for the
operator as shown in the
illustration
Foundation plate installation
The foundation plate can either be set into a concrete foundation, or
bolted down onto an existing concrete plinth, refer to illustrations
below.
Option 1:
New concrete foundation
When using a concrete foundation
it is recommended that the
foundation plate is welded to the
rail/track of the gate using a short
length of flat bar as shown in the
illustration. This makes it possible
to complete the whole mechanical
and electrical installation without
having to wait for the concrete to
set. After completing the
installation the concrete can be
poured and the operator left in
manual mode until the concrete
has set.
Ensure that the M10 gearbox mounting bolts are properly
tightened
Cable conduits must be installed before pouring the concrete
Option 2:
Bolting foundation
plate ontoan existing
concrete plinth
If bolting onto an existing
concrete plinth, place the
foundation plate down in the
correct position and use the plate
as a template for marking the
rawl bolt holes.
Ensure that the M10 gearbox mounting bolts are properly
tightened
Ensure that all the standard considerations for a quality
gate installation are adhered to as detailed in
CENTURION's detailed installation manuals.
These must include:
Foundation
plate
Flat bar welded to
foundation plate and rail
* Includes 3mm clearance required
between rack and pinion
M10
gearbox
mounting
bolts
400mm
Existing
concrete
plinth
400mm
43 - 53
Cable conduits
Gate rail
250mm
M10
gearbox
mounting
bolts
250mm