Centurion R5 Handleiding voor snelle installatie
1
R
EQUIRED
Check that you have all the tools required. (IM page 12)
2
S
ITE
Check for the safety and suitability of the site by looking at: (IM page
13)
All safety and local authority requirements.
That the gate is within the operator specifications.
Check that there is enough ground clearance to enable assembly of
the drivearm clamps. (See Figure 4)
3
C
ABLING
Consider all cabling requirements and routing as in Figure 9. (
14
)
4
O
PERATOR
Estimate the gate swing angle with figure 1.
Then mark the operator's position according to figure 2 or 3.
(IM page 15)
Figure 1 Gate Opening Angle Diagram
T
OOLS
C
ONSIDERATIONS
R
EQUIREMENTS
I
NSTALLATION
o
120
o
110
o
o
100
90
& E
QUIPMENT
(Gate opening angle)
o
60
o
70
o
80
IM page
o
0
3