Bernina Quilting Frame Montagehandleiding - Pagina 8

Blader online of download pdf Montagehandleiding voor {categorie_naam} Bernina Quilting Frame. Bernina Quilting Frame 16 pagina's.

Bernina Quilting Frame Montagehandleiding
6-2: Thread (2) M5 X 8mm SBHCS into the first two holes on the Track Runner to tighten the
coupler in place, as shown in Fig. 6-1.
6-3: Slide another Track Runner onto the other side of the coupler, making the top surface of the
Track Runners as flush as possible. Thread in (2) M5 X 8mm SBHCS into the inside holes as shown
in Fig. 6-1.
6-4: Repeat this process for the other Track Runner
assembly.
6-5: Place a Track Runner Assembly on the Front
Track Support, line up the holes on Track Support with
the holes on the Track Runners.
6-6: Thread (10) M5 X 15mm SBHCS down through
the Track Runner and Track Support but don't tighten
the SBHCS until the Step Placing Your Sewing Machine.
6-7: Repeat Steps 6-5 through 6-6
for the back Track Runner.
Step 7: Track Installation
Parts Needed:
4- 120" Track (King setup only)
4- 60" Track (Crib setup only)
7-1: Slide two pieces of Track into the Front Track
Support, as shown in Fig. 7-1.
7-2: Slide two pieces of the Track into the Back
Track Support.
Step 8: Frame End Assembly
Parts Needed:
1- Right Side Leg Brace
1- Left Side Leg Brace
1- Right Frame End
1- Left Frame End
6- M6 x 10mm SBHCS
4- M6 x 45mm SBHCS
Tools Required:
4mm Allen Wrench (Provided)
8-1: Attach the Left Side Leg Brace to the Side Leg with (2) M6 x 10mm SBHCS, as shown in Fig.
8-1, making sure the Bernina Logo faces out.
Table Surface
Fig. 6-2
Track Runner
Fig. 7-1
M5 X 15mm
SBHCS
Track
Pg.8