CORNING EDGE 1U Snelstarthandleiding - Pagina 2

Blader online of download pdf Snelstarthandleiding voor {categorie_naam} CORNING EDGE 1U. CORNING EDGE 1U 2 pagina's. 1u housing
Ook voor CORNING EDGE 1U: Snelstarthandleiding (4 pagina's)

CORNING EDGE 1U Snelstarthandleiding
4.4. Cable Routing
Route 900 micron fibers as shown on etching on shelf.
4.4a
NOTE: Reverse fiber routing if cable enters from other side of the housing.
4.4b
Secure fibers in slack management clips.
4.4c
Clean and mate adapters and connectors.
4.4d
Slide shelf back into housing.
Slide shelf in.
STANDARD RECOMMENDED PROCEDURE 003-876-QSG | ISSUE 4 | OctOber 2017 | PAGE 2 OF 2
5.
COMPLETING INSTALLATION
TPA-3879
To reinstall internal strain-relief
4.4e
assembly, slide keyway studs into
slots; slide toward front of housing.
Secure with plunger.
Plunger
TPA-3880
Corning Optical Communications LLC • PO Box 489 • Hickory, NC 28603-0489 USA
800-743-2675 • FAX 828-325-5060 • International +1-828-901-5000 • www.corning.com/opcomm
Corning Optical Communications reserves the right to improve, enhance, and modify the features and specifications of Corning Optical Communications products
without prior notification. A complete listing of the trademarks of Corning Optical Communications is available at www.corning.com/opcomm/trademarks. All other
trademarks are the properties of their respective owners. Corning Optical Communications is ISO 9001 certified. © 2011, 2017 Corning Optical Communications.
All rights reserved.
Reinstall covers. Slide together
5a
until they meet in the center
of the housing.
Pull label card out of front cover
5b
and attach label provided. (Or use
Avery
®
label 5162 [1
1
/
" x 4"].)
3
Record connections.
5b
5c
Close front and rear doors.
TPA-3881
TPA-3882