Kohler 23776T-7 Installatie-instructies - Pagina 2
Blader online of download pdf Installatie-instructies voor {categorie_naam} Kohler 23776T-7. Kohler 23776T-7 4 pagina's.
INSTALLATION
25.3
25.3
Ø3.5
Ø3.5
Ø35
1
Hex Wrench
2
3
4
Hole
5
6
COMPLETE THE INSTALLATION
NOTES: Do not plug in the power cord until all interface cables are connected.
NOTES: Make drip loops in all cables and cords.
□ Route the interface cable in the wall from the valve location to the interface installation location.
□ Connect the interface cable to the valve.
□ Verify there is power to the electrical outlet.
□ Plug the power cord into the outlet.
INSTALLATION CHECKOUT
□ Make sure all the connections are tightened.
□ Turn on the water supply to the valve.
□ Press the icon on the interface. The interface screen will be lit and the spout should be turned on.
□ Check all connections for leaks and make any adjustments as needed.
1388387-2A-A
□ Press the buckle at the back of the interface to
uninstall the backplate(4). Place the backplate at the
position where you intend to install the interface. Make
sure that the backplate is level, and keep "KOHLER"
logo pointing front.
□ Mark the positions of the fixing holes on the bathtub.
Drill the holes for the interface cable per the dimen-
sions.
□ Fit the backplate to the bathtub with the fixing
screws(1). Make sure that the backplate is level, and
keep "KOHLER" logo pointing front. Tighten the nuts
(6) with washers(5) to secure the backplate.
□ Connect the cable(2) at the back of the interface to
the cable(3) that comes from the valve.
□ Locate the top of the interface in the backplate and
press down to secure in position.
Notes: Insert one end of a hex wrench into the hole on
the backplate to remove the button, replace it if needed
during maintenance.
2